A completed Ventura County shingle reroof, from tear-off and deck preparation to new Owens Corning shingles.
From tear-off to finished shingles
Select a photo to see the full frame.
How the new roof went on
The old roofing came off to expose the deck. The crew prepared the roof and laid underlayment before installing the Owens Corning shingles. See the stages below and open any photo to view it full-size.
Tear-off
Old roof stripped back
The tear-off exposes wood decking across adjoining roof slopes.Deck preparation
Exposed deck around the skylight
The exposed boards and roof openings are visible before the next roofing layers go down.Deck preparation
Plank deck and vent
A second slope is stripped to the plank deck, with an existing penetration still visible.Deck preparation
Deck preparation at a roof transition
Deck preparation at the junction between adjoining roof sections.Underlayment
Underlayment across the pitched roof
White underlayment now covers the pitched deck around the existing roof penetrations.Underlayment
Preparing the pitched and low-slope sections
The photo shows separate preparations for the pitched shingle slopes and the adjacent low-slope roof.Shingle installation
New shingle courses taking shape
Installation is underway, with new gray shingle courses already covering much of this slope.Shingle installation
Installed shingles next to underlayment
This view shows an installed section alongside a slope still being prepared.Shingle installation
Gray shingles on the raised roof section
By this stage the raised section has shingle coverage, while work continues below.Shingle installation
Wide look at the new shingle field
A roof-level view shows the shingle pattern across a broad plane as installation nears its finish.Finished roof
Finished shingle field and ridge caps
The finished courses run across the slope and meet the capped ridge.Finished roof
Finished low-slope roof around the skylight
The final image shows the finished low-slope surface around the skylight and its transition to shingles.