THE LIONCREST 3D ROOF GUIDE

How a shingle roof comes together.

Explore architectural illustrations of a typical shingle reroof.

These are architectural illustrations, not photos or reconstructions of an actual job. Materials and detail sequence vary by roof system. Explore the interactive layer model

Architectural rendering of a house with its existing shingle roof.

Existing roof

Inspect the existing roof.

Look for wear, past repairs and trouble spots around roof edges and openings before removing anything.

The same house mid-tear-off, with old shingles beside areas of exposed decking.

Tear-off

Strip away the old roofing.

Removing the existing roofing exposes the underlying wood. The illustration shows tear-off underway, not yet a fully stripped roof.

The roof with its exposed plywood decking and visible panel seams.

Deck inspection

Check the exposed decking.

Inspect the wood for deterioration and replace unsound sections where needed so the new roof has a solid fastening surface.

The roof deck covered in dark protective underlayment.

Underlayment

Add the protective layer.

Choose underlayment suited to the roof system and install the overlaps and edge details to protect beneath the shingles.

The roof during installation, with flashing and vent details visible.

Flashing & vents

Detail the openings and edges.

Flashing directs water away from vulnerable openings and transitions. Vents and flashings fit into the system as the shingles go on.

The same house with finished architectural shingles and a capped ridge.

Finished roof

Finish with shingles.

Shingle courses and ridge caps complete the roof. The crew checks visible details and cleans up the work area.