Request an estimateTHE LIONCREST 3D ROOF GUIDE
How a shingle roof comes together.
Explore architectural illustrations of a typical shingle reroof.
These are architectural illustrations, not photos or reconstructions of an actual job. Materials and detail sequence vary by roof system. Explore the interactive layer model

Existing roof
Inspect the existing roof.
Look for wear, past repairs and trouble spots around roof edges and openings before removing anything.

Tear-off
Strip away the old roofing.
Removing the existing roofing exposes the underlying wood. The illustration shows tear-off underway, not yet a fully stripped roof.

Deck inspection
Check the exposed decking.
Inspect the wood for deterioration and replace unsound sections where needed so the new roof has a solid fastening surface.

Underlayment
Add the protective layer.
Choose underlayment suited to the roof system and install the overlaps and edge details to protect beneath the shingles.

Flashing & vents
Detail the openings and edges.
Flashing directs water away from vulnerable openings and transitions. Vents and flashings fit into the system as the shingles go on.

Finished roof
Finish with shingles.
Shingle courses and ridge caps complete the roof. The crew checks visible details and cleans up the work area.